Tauernwindpark

Submitted by gunnar on June 15, 2010 - 15:03
Tauernwindpark is the heighest situated wind farm.

Building time

Start

Finish

Period

05/07/2002

06/12/2002

5 month

Location

The Towernwindpark is located in central Austria in the mountains of Nieder Tauern and 1900 m above the sea level. The Towernwindpark is the highst located wind farm in the world.


Graph 1: Relations of interest rate and energy costs

Infrastructure

The farm can be reached over well developed streets.

Wind conditiones

Middle wind speed in hub heights

Middle power density of the wind

Full load hours

Cummulated power capacity

Energy production

7.0 m/s

472 W/m²

2150 h/a

19.25 MW

40 GWh/a

Technic

Manufacturer

Quantity

Type

Rated power

Rotor diameter

Swept area

Hub heights

Nominal revolutions

Operational interval

Cut-in wind speed

Rated wind speed

Cut-out wind speed

Wind tracking

Aerodynamc breakes

Mechanical breakes

Further information

Vestas Germany GmbH, Husum

11

V66 – 1.75 MW

1,750 kW

66.0 m

3421 m²

60.0 m

21.3 1/min

10.5 – 24.5 1/min

4 m/s

16 m/s

25 m/s

4 electro engines

Position of blades

Disc brake

www.mech.au

Investments

Wind power plant and equipment
Rights, Servitudes, etc.
Grid connection
Street connection
Legal fees, public relations and others
Design, construction management

16,915,206
1,541,960
3,910,000
605,000
377,000
515,000    

Total investments

23,864,166

O&M Costs (operating and maintenance costs)

Equipment, maintenance, reparations
Personal costs
Rental
Insurance
Administration

Others

474,650
106,000

43,000
140,000

40,000
75,000

Total O&M costs per year

878,650

Financing

Equity capital
Fundings (EU and others)
Long-term credits

3,650,000
2,583,073
17,631,093

Total financing

23,864,166

Specific Investments und Costs

Specific Investments

Specific O&M costs

1,239,696 €/MW

21.23 €/MWh

Energy costs

The energy costs are very depended on the interest rate. The interests rates for wind parks are often around 7 % and in this case the energy costs for an average year regarding the full load hours are 7,6 € ct/kWh. Fourther details are shown in graph 2.


 

Graph 2: Relations of interest rate and energy costs

Pay-back Time

Turbine type

Rated power

Commulated primary energy demand for construction, operationand maintenance[1]

Full load hours inland site

Energy gain inland site

Average efficiency, coal power plant in the world[2]

Pay-back time

Times of pay-back of cummulated energy demand for a lifetime of 20 years

Vestas V-66

1.75 MW

 

4580 MWh

2150 h/a

3760 MWh/a

31 %

4.5 month

53

Further information about the Tauernwindpark

www.tauernwind.com

Sources